Keyphrases
Due Date
100%
Production Planning
100%
Product Type
100%
NP-hard
100%
Inventory Control
100%
Setup Cost
66%
Polynomial Time
66%
Earliness
66%
Principal Investigator
33%
Strong Ties
33%
Production Cost
33%
Proposed Work
33%
Facility Environment
33%
Scheduling Model
33%
Close Ties
33%
Large Classes
33%
Tardiness Cost
33%
Single Machine
33%
Polynomial Time Solution
33%
Academicians
33%
Inventory Model
33%
Flexible Flow Shop
33%
Parallel Machines
33%
Polynomial-time Algorithm
33%
Hard Cases
33%
Engineering
Inventory Control
100%
Production Planning
100%
Polynomial Time
100%
Product Type
75%
Setup Cost
50%
Practical Significance
25%
Project Team
25%
Mathematics
Polynomial Time
100%
Product Type
75%
Inventory Model
25%
Practical Significance
25%
Real-World Data
25%
Single Machine
25%
Minimizes
25%