Abstract

Flexible manufacturing systems are characterized by versatility and flexibility, but they pose a challenging scheduling problem. Finding optimal fixed schedules is an NP-hard problem, particularly when material movement is automated by shared mechanisms. Alternatively, shared resources can be scheduled in real time by demand, using priority or random selection when choices arise. In a refinement of this type of scheduling, system elements, such as machines, generate requests for shared resources in advance of actually needing them. We call this anticipatory scheduling. This technique is applied to two examples of flexible manufacturing cells: one, a flow shop with a single product type [1], and the other, a flexible manufacturing cell with several possible paths for the multiple job types [2]. Performance was assessed using timed Petri net system models. Results with anticipatory scheduling are promising.

Original languageEnglish (US)
Pages (from-to)4131-4136
Number of pages6
JournalProceedings of the IEEE International Conference on Systems, Man and Cybernetics
Volume5
StatePublished - 1995
EventProceedings of the 1995 IEEE International Conference on Systems, Man and Cybernetics. Part 2 (of 5) - Vancouver, BC, Can
Duration: Oct 22 1995Oct 25 1995

All Science Journal Classification (ASJC) codes

  • Control and Systems Engineering
  • Hardware and Architecture

Fingerprint

Dive into the research topics of 'Anticipatory real-time scheduling in manufacturing cell design'. Together they form a unique fingerprint.

Cite this