Abstract
This study develops a practical method to calculate costs and benefits of the implementation of optimal signal timing plans with synchro. A segment on Route 23 in New Jersey is used as a case study. Results showed a substantial benefit in reducing signal delays, fuel consumption and vehicular emissions.
Original language | English (US) |
---|---|
Pages | 37-41 |
Number of pages | 5 |
Volume | 76 |
No | 10 |
Specialist publication | ITE Journal (Institute of Transportation Engineers) |
State | Published - Oct 2006 |
All Science Journal Classification (ASJC) codes
- Automotive Engineering
- Mechanical Engineering