Abstract
This study develops a practical method to calculate costs and benefits of the implementation of optimal signal timing plans with synchro. A segment on Route 23 in New Jersey is used as a case study. Results showed a substantial benefit in reducing signal delays, fuel consumption and vehicular emissions.
| Original language | English (US) |
|---|---|
| Pages | 37-41 |
| Number of pages | 5 |
| Volume | 76 |
| No | 10 |
| Specialist publication | ITE Journal (Institute of Transportation Engineers) |
| State | Published - Oct 2006 |
All Science Journal Classification (ASJC) codes
- Automotive Engineering
- Mechanical Engineering