Keyphrases
Deadline-aware
100%
Service Flow
100%
Scheduling Services
100%
Short Flow
83%
Transmission Rate
33%
Flow Control
33%
Tight
16%
State Information
16%
Heavy Load
16%
Application Throughput
16%
Achievable Throughput
16%
Minimum Flow
16%
Flow State
16%
Fast Transmission
16%
Bandwidth Demand
16%
Effective Flow
16%
Lossless Transmission
16%
Data Center Traffic
16%
Data Update
16%
Credit Based
16%
Maintenance Data
16%
Computer Science
Data Center
100%
Scheduling Service
100%
Transmission Rate
50%
Flow Control
50%
Data Source
25%
State Information
25%
Data Maintenance
25%
Engineering
Transmissions
100%
Service Flow
100%
Control Flow
40%
Longer Term
20%
Data Source
20%
State Information
20%
Heavy Load
20%
Flow State
20%
Functional Operation
20%