Keyphrases
Production System
100%
Decomposition Method
100%
Single Machine Scheduling Problem
100%
Steel Production
100%
Steel Plant
60%
Wire Rod Rolling
60%
Bar Rolling
60%
Rolling Process
60%
Release Time
40%
Mixed Integer Programming
40%
Two-stage Decomposition
40%
Industrial Use
20%
Direct Impact
20%
Scheduling Problem
20%
Production Scheduling
20%
Time Constraints
20%
Continuous-time
20%
NP-hard Problem
20%
Number of Tardy Jobs
20%
Computational Results
20%
Simulated Case
20%
Sequence-dependent Setup Times
20%
All-small
20%
Production Efficiency
20%
Due Time
20%
Production Profit
20%
Engineering
Rod
100%
Production System
100%
Steel Plant
100%
Rolling Process
100%
Steel Production
100%
Tasks
33%
Continuous Time
33%
Setup Time
33%
Release Time
33%