Skip to main navigation Skip to search Skip to main content

Delay Analysis of Various Service Disciplines in Symmetric Token Passing Networks

  • Dionysios Karvelas
  • , A. Leon-Garcia

Research output: Contribution to journal › Article › peer-review

Abstract

In this paper a new approach to the delay analysis of various service disciplines in symmetric token passing networks is presented. It is shown that exact or approximate accurate expressions for the average packet delay of different service disciplines can be directly derived by the delay expression of the Exhaustive service system. This can be accomplished by inflating, by an appropriate factor, the packet size of the discipline whose performance is analyzed and then using the inflated packet into the delay expression of the Exhaustive service system. The proposed method is applied to the analysis of the Limited service and TTS disciplines, and its accuracy is verified by simulation results. The advantages of the presented analytic method are its generality, higher accuracy over previous analytic methods, and its insensitivity to network latency and other system parameters.

Original languageEnglish (US)
Pages (from-to)1342-1355
Number of pages14
JournalIEEE Transactions on Communications
Volume41
Issue number9
DOIs
StatePublished - Sep 1993

All Science Journal Classification (ASJC) codes

  • Electrical and Electronic Engineering

Fingerprint

Dive into the research topics of 'Delay Analysis of Various Service Disciplines in Symmetric Token Passing Networks'. Together they form a unique fingerprint.

Cite this