Keyphrases
Screening System
100%
Security Screening
100%
Inspection System
100%
Security Inspection
100%
Service Rate
75%
Passenger Safety
25%
Numerical Results
25%
Performance Metrics
25%
Operating Cost
25%
Museum
25%
Airport
25%
Average Waiting Time
25%
Operating Characteristic Curve
25%
Total System Cost
25%
Arrival Rate
25%
Queuing Model
25%
Two-stage Inspection
25%
Improvement Factor
25%
Primary Performance
25%
US Airports
25%
Shopping Mall
25%
Inspection Interval
25%
Inspection Services
25%
Engineering
Airfield
100%
Optimal Design
50%
Operational Cost
50%
Specifies
50%
Metrics
50%
System Cost
50%
Operating-Characteristic Curve
50%
Arrival Rate
50%
Service Inspection
50%