Ensuring quality in resource constrained project scheduling

Oya Icmeli-Tukel, Walter O. Rom

Research output: Contribution to journalArticlepeer-review

45 Scopus citations

Abstract

This study constitutes an initial effort for modeling and solving resource constrained project scheduling problems with the objective of maximizing quality. Two mixed integer formulations of the problem are introduced. The first formulation assumes integral activity durations and completion times. These assumptions are relaxed in the second formulation. In both formulations the quality of a project is measured by the amount of rework required and the corresponding additional cost incurred. These quality measures are expressed in a common unit of measure and incorporated into the objective function. The second mixed integer formulation is found to be more efficient and thus computational results are reported based on that model. A set of resource constrained scheduling problems are solved using the quality objective and traditional objective functions from the literature. In general it is found that the schedules obtained when maximizing quality outperform the schedules obtained with minimizing makespan or maximizing the net present value of project cash flows objectives in terms of makespan, cost and computational times.

Original languageEnglish (US)
Pages (from-to)483-496
Number of pages14
JournalEuropean Journal of Operational Research
Volume103
Issue number3
DOIs
StatePublished - Dec 16 1997
Externally publishedYes

All Science Journal Classification (ASJC) codes

  • General Computer Science
  • Modeling and Simulation
  • Management Science and Operations Research
  • Information Systems and Management

Keywords

  • Project scheduling
  • Quality
  • Reworks

Fingerprint

Dive into the research topics of 'Ensuring quality in resource constrained project scheduling'. Together they form a unique fingerprint.

Cite this