TY - GEN
T1 - Field-test of the new ASHRAE/CIBSE/USGBC performance measurement protocols for commercial buildings
T2 - 2012 ASHRAE Winter Conference
AU - Kim, Hyojin
AU - Haberl, Jeff S.
PY - 2012
Y1 - 2012
N2 - The new Performance Measurement Protocols (PMP) provide a standardized set of protocols for measuring and comparing the operational performance of occupied commercial buildings. The PMP was developed at three levels of cost/accuracy Basic (Indicative), Intermediate (Diagnostic), and Advanced (Investigative), for the following six performance categories: energy, water, thermal comfort, Indoor Air Quality (IAQ), lighting, and acoustics. This paper presents the preliminary results of an effort to develop and apply a field test to evaluate the PMP basic level in a case-study office building in central Texas. In accordance with the basic level protocol, basic building performance- related building and system characteristics and monthly utility bills of the case-study building were collected. Next, the corresponding performance metrics, including annual whole-building energy use and cost indices and annual total site water and cost indices were calculated and compared with the appropriate benchmarks. In addition, a subjective Indoor Environmental Quality (IEQ, i.e., thermal comfort, IAQ, lighting, and acoustics) assessment survey was conducted with spot measurements of several IEQ-related parameters in selected places in the building. Measurements were then compared with the appropriate benchmarks.
AB - The new Performance Measurement Protocols (PMP) provide a standardized set of protocols for measuring and comparing the operational performance of occupied commercial buildings. The PMP was developed at three levels of cost/accuracy Basic (Indicative), Intermediate (Diagnostic), and Advanced (Investigative), for the following six performance categories: energy, water, thermal comfort, Indoor Air Quality (IAQ), lighting, and acoustics. This paper presents the preliminary results of an effort to develop and apply a field test to evaluate the PMP basic level in a case-study office building in central Texas. In accordance with the basic level protocol, basic building performance- related building and system characteristics and monthly utility bills of the case-study building were collected. Next, the corresponding performance metrics, including annual whole-building energy use and cost indices and annual total site water and cost indices were calculated and compared with the appropriate benchmarks. In addition, a subjective Indoor Environmental Quality (IEQ, i.e., thermal comfort, IAQ, lighting, and acoustics) assessment survey was conducted with spot measurements of several IEQ-related parameters in selected places in the building. Measurements were then compared with the appropriate benchmarks.
UR - http://www.scopus.com/inward/record.url?scp=84865027480&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84865027480&partnerID=8YFLogxK
M3 - Conference contribution
AN - SCOPUS:84865027480
SN - 9781936504220
T3 - ASHRAE Transactions
SP - 135
EP - 142
BT - ASHRAE Transactions - Papers Presented at the 2012 ASHRAE Winter Conference in Chicago, Illinois
PB - ASHRAE
Y2 - 21 January 2012 through 25 January 2012
ER -