Keyphrases
Process-based
100%
Petri Nets
100%
Iterated Greedy Algorithm
100%
Batch Production Process
100%
Heuristic Scheduling
100%
Scheduling Problem
66%
NP-hardness
66%
Number of Tardy Jobs
66%
CPLEX
66%
Wire Rod Rolling
66%
Bar Rolling
66%
Near-optimal Solution
33%
Production System
33%
Industrial Use
33%
Commercial Software
33%
Release Time
33%
Petri Net Model
33%
Process Scheduling
33%
Mixed Integer Linear Program
33%
Stability Accuracy
33%
Firing Sequence
33%
Steel Production
33%
Rolling Process
33%
Industrial Production Process
33%
Descent Method
33%
Serial Batch
33%
Variable Neighborhood Descent
33%
Sequence-dependent Family Setup Times
33%
Neighborhood Structure
33%
Engineering
Greedy Algorithm
100%
Batch Manufacturing
100%
Rod
66%
Experimental Result
33%
Industrial Production
33%
Petri Net Model
33%
Production System
33%
Setup Time
33%
Linear Program
33%
Commercial Software
33%
Release Time
33%
Rolling Process
33%
Steel Production
33%