Abstract
An improved manufacturing process and increased efficiencies are reported for 1-ft multiplied by 3-ft interconnected panels. The basic steps in the process are reviewed, and changes to the process are described. Results are given for the performance of a six-pack run at a pilot plant. A detailed breakddown of costs is provided, showing the economic benefits of the process.
| Original language | English (US) |
|---|---|
| Pages (from-to) | 1522-1523 |
| Number of pages | 2 |
| Journal | Conference Record of the IEEE Photovoltaic Specialists Conference |
| State | Published - 1987 |
| Externally published | Yes |
All Science Journal Classification (ASJC) codes
- Control and Systems Engineering
- Industrial and Manufacturing Engineering
- Electrical and Electronic Engineering