TY - GEN
T1 - Modeling and scheduling of cluster tools dealing with wafer revisiting
T2 - 2015 12th IEEE International Conference on Networking, Sensing and Control, ICNSC 2015
AU - Pan, Chunrong
AU - Zhou, Mengchu
AU - Qiao, Yan
AU - Wu, Naiqi
N1 - Publisher Copyright:
© 2015 IEEE.
PY - 2015/6/1
Y1 - 2015/6/1
N2 - For some fabrication processes, such as atomic layer deposition, wafers need to visit some process modules for a number of times, instead of once, thus leading to a revisiting process. It is complicated to schedule cluster tools with wafer revisit in semiconductor fabrication. This paper briefly discusses the modeling and scheduling issues for cluster tools dealing with a revisiting process. Then, we review and compare the methods for their modeling and scheduling. Finally, future research directions and conclusions with a revisiting process are finally given.
AB - For some fabrication processes, such as atomic layer deposition, wafers need to visit some process modules for a number of times, instead of once, thus leading to a revisiting process. It is complicated to schedule cluster tools with wafer revisit in semiconductor fabrication. This paper briefly discusses the modeling and scheduling issues for cluster tools dealing with a revisiting process. Then, we review and compare the methods for their modeling and scheduling. Finally, future research directions and conclusions with a revisiting process are finally given.
KW - Cluster tools
KW - Revisiting processes
KW - Semiconductor manufacturing
KW - scheduling
UR - http://www.scopus.com/inward/record.url?scp=84941205827&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84941205827&partnerID=8YFLogxK
U2 - 10.1109/ICNSC.2015.7116047
DO - 10.1109/ICNSC.2015.7116047
M3 - Conference contribution
AN - SCOPUS:84941205827
T3 - ICNSC 2015 - 2015 IEEE 12th International Conference on Networking, Sensing and Control
SP - 271
EP - 276
BT - ICNSC 2015 - 2015 IEEE 12th International Conference on Networking, Sensing and Control
PB - Institute of Electrical and Electronics Engineers Inc.
Y2 - 9 April 2015 through 11 April 2015
ER -