Abstract
In operating a multi-cluster tool, it needs to coordinate the activities of multiple robots. Thus, it is very challenging to schedule it. This paper conducts a study on one-wafer cyclic scheduling for multi-cluster tools whose bottleneck cluster tool is process-bound. The system is modeled by a Petri net. With this model, conditions under which a one-wafer cyclic schedule exists are developed. Based on them, it is shown that, for any multi-cluster tool whose bottleneck cluster tool is process-bound, there is always a one-wafer cyclic schedule. Then, a method is presented to find the minimal cycle time and the optimal one-wafer cyclic schedule. It is computationally efficient. Illustrative examples are used to show the applications and effectiveness of the proposed method.
Original language | English (US) |
---|---|
Article number | 6579732 |
Pages (from-to) | 578-591 |
Number of pages | 14 |
Journal | IEEE Transactions on Semiconductor Manufacturing |
Volume | 26 |
Issue number | 4 |
DOIs | |
State | Published - 2013 |
All Science Journal Classification (ASJC) codes
- Electronic, Optical and Magnetic Materials
- Condensed Matter Physics
- Industrial and Manufacturing Engineering
- Electrical and Electronic Engineering
Keywords
- Cluster tool
- Petri net
- Scheduling
- Semiconductor manufacturing