Abstract
Parallel, or concurrent, or simultaneous engineering (CE/SE) integrates design, manufacturing, quality control, shop floor automation, marketing, and other processes to cut lead time. CE/SE focusses on parallel interaction among various product life cycle concerns. It is a systematic approach to integrate, concurrent design of products and their related processes, including manufacture and support. This approach is intended to cause Rolls-Royce Motor Cars Limited, to consider all elements of the product life cycle from conception through disposal, including quality, cost schedule and user requirements.
Original language | English (US) |
---|---|
Pages | 24-26 |
Number of pages | 3 |
State | Published - 1997 |
Externally published | Yes |
Event | Proceedings of the 1997 IEEE 6th International Conference on Emerging Technologies and Factory Automation, ETFA'97 - Los Angeles, CA, USA Duration: Sep 9 1997 → Sep 12 1997 |
Other
Other | Proceedings of the 1997 IEEE 6th International Conference on Emerging Technologies and Factory Automation, ETFA'97 |
---|---|
City | Los Angeles, CA, USA |
Period | 9/9/97 → 9/12/97 |
All Science Journal Classification (ASJC) codes
- General Engineering