title = "Scheduling highway maintenance projects with genetic algorithms",
abstract = "The schedule of highway work zones significantly affects maintenance project cost and duration as well as the convenience of traveling public and local businesses. Optimization of work zone schedules may result in substantial benefits to responsible agencies, contractors and roadway users in terms of reduced costs, delay and safety hazards. The work zone scheduling problem is a large combinatorial optimization problem and difficult to be solved analytically. The Genetic Algorithm (GA) developed in this study may assist transportation agencies to schedule work zone lane closures more efficiently. An example is presented to demonstrate the application of the developed GA.",
keywords = "Cost, Delay, Genetic Algorithm, Highway Maintenance, Optimization, Scheduling, Traffic Control, Work Zone",
author = "Yimin Tang and Steven Chien",
year = "2007",
language = "English (US)",
isbn = "1934272159",
series = "WMSCI 2007 - The 11th World Multi-Conference on Systemics, Cybernetics and Informatics, Jointly with the 13th International Conference on Information Systems Analysis and Synthesis, ISAS 2007 - Proc.",
pages = "200--205",
booktitle = "WMSCI 2007 - The 11th World Multi-Conference on Systemics, Cybernetics and Informatics, Jointly with the 13th International Conference on Information Systems Analysis and Synthesis, ISAS 2007 - Proc.",
note = "11th World Multi-Conference on Systemics, Cybernetics and Informatics, WMSCI 2007, Jointly with the 13th International Conference on Information Systems Analysis and Synthesis, ISAS 2007 ; Conference date: 08-07-2007 Through 11-07-2007",
}