Skip to main navigation Skip to search Skip to main content

Throughput and delay analysis of FDDI and FDDI-II under mixed traffic

  • Dennis Karvelas
  • , A. Leon-Garcia

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Abstract

In this paper a throughput and delay analysis of FDDI and FDDI-II is presented under mixed traffic. The case of voice/data transmission is considered, and the throughput and delay behavior of FDDI, under packetized voice transmission, and FDDI-II, under isochronous voice transmission, is examined. The performance of the two networks is then investigated under the transmission of voice, data, and video. Two transmission alternatives are considered. In the first, all three types of information are transmitted in packets over an FDDI network. In the second, the isochronous slots of FDDI-II carry the voice and video. The effect of various system parameters on the performance of both networks is examined, and their voice, video, and data performance are compared.

Original languageEnglish (US)
Title of host publicationProceedings - 17th Conference on Local Computer Networks, LCN 1992
PublisherIEEE Computer Society
Pages142-151
Number of pages10
ISBN (Electronic)0818630957
DOIs
StatePublished - 1992
Event17th Conference on Local Computer Networks, LCN 1992 - Minneapolis, United States
Duration: Sep 13 1992Sep 16 1992

Publication series

NameProceedings - Conference on Local Computer Networks, LCN

Conference

Conference17th Conference on Local Computer Networks, LCN 1992
Country/TerritoryUnited States
CityMinneapolis
Period9/13/929/16/92

All Science Journal Classification (ASJC) codes

  • Computer Networks and Communications
  • Hardware and Architecture

Fingerprint

Dive into the research topics of 'Throughput and delay analysis of FDDI and FDDI-II under mixed traffic'. Together they form a unique fingerprint.

Cite this